Typical applications are processed within 3-4 weeks.
- Step 1: Plan Your Deck Location. A site plan is required for all applications.
- Step 2: Design Your Deck. The Deck Design Form is required for all applications.
- Step 3: Submit Your Application. Fees.
- Step 4: After You Apply. Application Processing.
Do I need a building permit for a deck in Alberta?
Do I need a permit? You will need a Building Permit if: Your deck will be higher than 0.6m (approximately two feet) above grade at any point. You are building a covered deck such as an enclosed sundeck, a deck with open rafters or a gazebo (this is considered an addition and may require a Development Permit).
Do I need a permit to replace a deck in Edmonton?
If your deck contains a roof or walls, you will have to apply for a permit to build it. Depending on the complexity of the project, you might have to get a structural engineer involved.
How deep do deck piles need to be Edmonton?
Stringers, after shaping, must have at least 90mm (3½”) minimum effective depth and at least 235mm (9¼”) overall depth, as measured perpendicular to the bottom of the 13 UNCOVERED DECK DESIGN GUIDE. Content subject to periodic update. Ensure use of the most recent version. Last Updated: 14 September 2021 Page 14
How long does it take to get a development permit in Edmonton?
New Home Construction Permits
Permit Type | Processing Time |
---|---|
Greenfield Development Permit | 25 Days |
Greenfield Building Permit | 35 Days |
Infill Development Permit | 40 Days |
Expedited Infill Development Permit* Class A single–detached and semi–detached house permits only. | 20 Days |
Can I build a deck without planning permission?
If you are proposing to create decking more than 30cm above ground level, you will require Planning permission. In addition, if you intend to cover more than 50% of the total garden area with decking, you will require Planning Permission. This is true even if the decking will be well below 30cm from ground level.
Can I build a deck without consent?
If you plan to build a deck that is up to 1.5m high, you don’t need a building consent but you may still need a resource consent, depending on the rules in the Proposed Auckland Unitary Plan. If your deck is more than 1m high, it must have a handrail.
Can I replace my deck myself?
If your existing deck is old, shabby and a maintenance nightmare, you don’t have to tear it all down and start over. Chances are that the structural parts are still in good shape. If so, you can simply remodel it with new decking, rails and stairs, and save tons of money over the cost of a complete rebuild.
Do you need an engineer to build a deck?
You may be able to build small decks that are low to the ground and on a flat grade by yourself. But for larger decks or challenging site conditions, a general contractor will be required to ensure that work is completed safely and properly.
Do I need a permit for a concrete patio Edmonton?
No permits are required to landscape your property, however you may require a permit if you are building a fence or want to include a deck, shed, gazebo, hot tub or water feature in your yard.
Can you put a deck directly on the ground?
You can either build it directly on the ground or square the site and build it on top of risers as a floating deck. If you lay it directly on the ground, you may find that it’s more susceptible to absorbing moisture and might need additional maintenance.
Does a deck have to be cemented into the ground?
Large decks that are attached to the house should always have footings because they act to spread the heavy load of the deck from the surface of a support post over a large surface of the soil so the ground can adequately support it.
How far off the ground can a deck be?
There is no standard height for a “grade-level” deck—the maximum measurement from grade to the deck surface could be 6 inches, 12 inches, 24 inches, or more. But generally speaking, I apply the term to decks that are up to 30 inches above grade, since guardrails are required for any decks that are higher than that.
What is a Class B development permit in Edmonton?
Class B – Discretionary Development
This class includes all developments that are for a Discretionary Use (at the discretion of the City), or require a change to any of the regulations of a bylaw. These projects require a development permit.
What is the penalty for building without a permit near Edmonton AB?
Section 23A – Specified Penalties for Offences
Offence | Section | Minimum Penalty First Offence |
---|---|---|
Construction of fence, wall or gate exceeding maximum Height regulations without a Development Permit | 23.1(9) | $250.00 |
Construction of a Platform Structure without a Development Permit | 23.1(10) | $250.00 |
What do you need a permit for Edmonton?
Renos and additions to single detached and semi-detached houses and row houses up to 4 units may require home improvement permits and inspections.
Home Improvement Permits
- Book Appointment.
- Deck.
- Demolition.
- Detached Garage & Shed.
- Fence.
- Home Renovations & Basements.
- Hot Tub.
- Renewable Energy Systems.
What are the rules for building a deck?
WHAT YOU NEED TO KNOW
- 36 “minimum height when surface is 30” + above grade.
- 200 lb concentrated load.
- 50 lb concentrated load over 1 sqft or balusters.
- 50 lbf vertical and horizontal load along top rail.
- 4 “maximum gap between deck and underside of bottom rail.
- 4 “maximum gap between balusters.
What should you not do when building a deck?
12 Deck Building Mistakes to Avoid
- Being Inattentive to Local Deck Building Code.
- Building Inadequate Deck Post Footers.
- Attaching the Beam to the Sides of the Support Posts.
- Incorrectly Spacing the Joists.
- Installing the Wrong Deck Boards for Your Use.
- Attaching the Ledger Board Directly to the Siding.
Can you build a deck without digging holes?
If you’re ready to start planning, there are two great options to build a deck without digging any holes: surface deck blocks and deck foot anchors. The cheapest foundations are deck blocks, which can be purchased for less than $12.00 a piece. Deck blocks sit on the ground, so proper planning is essential.
Can a beginner build a deck?
Decks can be single-level or multi-level; they can be some of the simplest “first” projects for a beginner or elaborate examples of sophisticated craftsmanship. Decks are quite often the first project many beginning do-it-yourselfers tackle, but it’s important to understand the basics of deck construction.
How high can a deck be without footings?
According to the International Residential Code (IRC), no permit is needed if you’re building a deck that does not exceed 200 square feet in area, is not more than 30 inches above the ground at any point, is not attached to a dwelling and does not serve an exit door to a building.